Home  
Technology Dealers Add favorites Contact
Home
About Us
Products
Health Benefits
Installation
Lifetime Warranty
Installation

You may download the manuals in .pdf format below
Outdoor Units | 3 person Corner Unit | All other units

Installation Deluxe Sauna
click to enlarge


Step 1Step 1
Place the bottom board in the desired location of your sauna. The sauna will be assembled on top of it. Then place the front panel with door on the front of the bottom panel.



Step 2Step 2
Place the left side wall on the bottom, lift it in order to make the two pieces of pothooks lock on the corresponding slots on the front panel, then put it down; after that, fix the left side wall with bottom panel by the special latching system.


Step 3Step 3
Locate back wall and attached to the left side wall section with the special latching system. Locate right wall on the bottom panel, lift it to make its pothooks lock on the corresponding slots of the front wall, then press it down securing the wall in place; after that, secure it to the back wall by latching system on the other side.


Step 4Step 4
Locate bench front with heating element and slide it down vertically into the slot located on the inside wall. Next, connect the bench's heater element wire to corresponding wire from the back wall, then locate seat top section and slide into place.


Step 5Step 5
Locate the wall panel wiring and drape outside the completed unit to make room for installation of the ceiling. These wires will be flipped back after the ceiling is in place. Then connect before the roof panel is put on.

Locate ceiling panel, rise above the walls and set in place to complete the enclosure. The ceiling should fit easily.

Flip the wall panel wiring back over the top of the ceiling and recheck all latches to make sure all walls are latched together correctly and tightly .And cotter pins have been installed.


Step 6Step 6
Unpack the CD player and Faceplate control from the box. Plug audio wire from the Power Board into the back of the CD player. Locate the control panel's main wire A from the Power Board, and attach to the back of the external control panel. Attach the internal control box to the small batten under the CD box.


Step 7Step 7
Place the internal top ceiling on the completed sauna room to cover all internal wiring.

 

Congratulations! The installation is completed.

Call Us Today, and we gurantee to Beat any Advertised Price.

ADDITIONAL DISCOUNTS AVAILABLE FOR SELECT SHIPPING LOCATIONS.

Deluxe 2 Person Sauna
$959.00 Weekly Special
Deluxe 2 Person Sauna
This is our top selling unit. Order now to take advantage of our weekly special and receive free shipping (liftgate and residential delivery fees included!) The price you see is the price you pay.
Deluxe 4 Person Sauna
$1799.00 Weekly Special
Deluxe 4 Person Sauna
This spacious and affordable model offers 45% more room than our 2 Person unit. Order now to take advantage of our weekly special and receive free shipping (liftgate and residential delivery fees included!) The price you see is the price you pay.
3-Person Deluxe Sauna
$ 1499  
Learn More
 



*On select models and shipping locations, please contact us for details.
Copyright
© DeluxeSauna.com
Created by Graphic Design © 1998-2006 BraginDesign Studio